Floor construction
Floor flatness is an important factor in all warehouse floors. The challenge is the efficient use of floor layout. These include space, machines, and equipment. TK Flat Floor has a wide range of abilities to provide high-quality concrete flooring services at an effective cost.
We committed the variety of serviceable range:
- Design and Construction process
- Mocking and forming the ….
- Screed floor by laser screed machine
- Joint control or even without Joint
- Super flat Floor construction
- Repairing floor by laser grinding
- Burnished concrete floor
Design and Construction process
We offer the complete methods of flooring design and construction to customers. No matter what issue is in consideration, we shall always come up with a design standard cover done by the international professional organization, known as Face Consultants.
Face Consultants has a major role in coordination between the logistic industry and Construction industry. The key point is to comprehend the requirements and capabilities of one another to make a good deal with the least possibility of problems in the future.
The term of design is including not only the structural points of view but down deep in detail about the specification. Well-planned design guides you with an avoidance of over-specified standard which needlessly costs you more. Staying on the track with a Face consultant will provide you a well-fitted design for your floor requirement and purposes in practice.
Mocking and forming the pouring area
No matter how flat your floor is, it completely has no use if the equipment can be slipping during the application. This means the floor has failed in elevation. Flatness always comes with levelness
Mocking is the process to control the elevation of the finished floor. The slab surface would be leveled exactly the same as the pre-setup woody forms around the pouring area. This is important to achieve levelness.
We offer the procedure to make use of the dip-stick equipment from Face Consultant to verify the level of the woody form prior to spreading concrete. Based on the standard, the woody form level has a tolerance within +-1mm.
Assure the accurate level of the woody form prior to starting pouring the concrete or you forget about the next step and so on.
Screed floor by laser screed machine
Using the Somero SXP laser screed machine, we can lay the specified (FM-number system or TR34 Document) tolerant concrete of the free movement floor up to 3000 cubic meters within a single day.
Depending on the pour area size we are dealing with, some area has a limited size with high tolerance control. We offer a smaller laser screed machine and power rake to reach up to the area when the large laser screed cannot be used
Joint control or even without Joint
Because cracks on the finished concrete slab are normal behavior of the concrete shrinkage, a cutting joint is then performed to keep a guide for the random crack through the predetermined line on the floor.
Apart from the construction joint, one bay should be cut to the section size of 3×3 meters approximately for the free movement traffic.
On the other hand, in the defined movement traffic, Jointing is not allowed. We offer dramatic 5D technology to solve the specification. This triple hooked-end fiber provides adequate micro tensile force to the cement phase against concrete shrinkage forces.
The Expert in Floor Industrial
Surface finishing
Use check rod highway straightedge to reduce bumps and fill low spots
Features of Laser Screed
- Increase floor flatness
- Higher productivity
- Less from work and less labor
Edge Finishing
Ensure the better jointing system
Pan Float
Finishing with pan float for increasing flatness
Final Finishing Floor
Obtaining the Burnished Finish